ETHANOL PLANTS

Czech English Russian    
Introduction    Print    Site map      
   Inquiry   

ETHANOL PLANTS

SWP Trading, a. s., CZ
Contract for the turn-key construction of Bioethanol plant in Horní Suchá, capacity 80 kt/year a.a. for fuel purposes. Start of the basic design and detail engineering in 2009, interrupted in 2010.

Chematur Engineering, Sweden
Design documentation, chase of construction of operational unit „Hydrolysis“ for PLP a. s., bioethanol plant in Trmice.

Jaunpagasts Plus, city Iecava, Latvia

Reconstruction of existing bio ethanol plant to final capacity of 350 hl/d a.a. for fuel purposes. The start of operation in 11/2008.
 
PI Promstrojprojekt, Almaty, Kazakhstan
Project for building permit of bio ethanol plant or production of 100,000 tons per year. Finish 11/2008
 
BI Projekt Astana, Kazakhstan
Project for building permit of bio diesel plant or production of 100,000 tons per year. Finish 11/2008


BGV, s.r.o. Stará Ľubovňa, Slovak Republic
Extension of existing plant up to final capacity 350 hl/d a.a., turn-key delivery of a new ethanol plant with capacity 200 hl/day a.a. of extra fine. Start of operation in 12/2007.

GAS Família s.r.o., Stará Ľubovňa, Slovenská republika
Project for building permit of plant for ethyl alcohol and wine production.

Noventa, s.r.o., Ujčov
Design, delivery and commissioning of distillation column with accessories.

Jaunpagasts Plus, city Jaunpagasts, Latvia
Delivery of distillation unit and dehydration unit of raw alcohol 200 hl/day a.a. for fuel purposes. Finish 2004.

Jaunpagasts Plus, city Iecava, Latvia
Delivery of distillation unit and dehydration unit of raw alcohol 150 hl/day a.a. quality extra fine spirit and for fuel purposes. Finish 2003.

BGV, Stará Ľubovňa, Slovak Republic
Turn-key delivery of ethanol and bio ethanol plant capacity 150 hl/day a.a. of extra fine spirit as well as anhydrous alcohol. Finish 2002.

IRAF Bratislava s.r.o., Slovak Republic
Delivery of dehydration unit for production of anhydrous alcohol 150 hl/day a.a. Finish 2002.

Moravský lihovar a. s. (Former Seliko a.s.), Kojetín, CZ
  • Design of the reconstruction of distillery plant of 60 000 l/day a. a. based on sugar beet juice.
  • Delivery of the 6-stage evaporating station for thickening the stillage for distillery plant based on sugar beet juice of 60 000 l/day a. a.
  • Erection of the distillation part of distillery plant based on sugar beet juice of 60 000 l/day a. a.
  • Design, delivery and erection of the control system and instrumentation of distillery plant based on sugar beet juice of 60 000 l/day a. a.
    Finish 1995

ARAJ , Kazakhstan
Turn-key delivery of distillery plant of 25 000 l/day a. a. Finish 1996.
 
ARAJ Kazakhstan
Delivery of the technological equipment including the instrumentation of distillery plant of 25 000 l/day a. a. - repeated delivery. Finish 1997.
 
ZNOK-POL-B, Łódź, Poland
Design of distillery plant of 45 000 l/day a. a. extra fine spirit and 90 000 l/day a. a. anhydrous alcohol. Finish 1995.
 
BIOFERM, a.s., Kolín, CZ
Reconstruction of evaporating plant for thickening of molasses stillage. Finish 1993.
 
Perpet, s.r.o.Hradec Králové, CZ
Design of a distillery plant of 4 000 l/day a. a. Finish 1993.